2008 Biomass Co-Gen – 34MW

Photo Gallery: Click the thumbnails above to see full gallery (6 images)

2008 Biomass Co-Gen – 34MW

Reading, PA

Property Description

Reading, PA – Complete Biomass Cogeneration Facility


2008 Construction – Rated at 34 MW, Siemens Steam Turbine Generator (STG), Holtec Steam Surface Condenser, CFB Boiler – 330,000 lbs/hr Steam Generation, Extraction Steam, Selective Catalytic Reduction (SCR) System, Trona Injection System, Howden Buffalo ID Fans, KSB Boiler Feed Pumps, (2) Cell Mechanical Draft Cooling Tower, Biofuel Silo, Electrostatic Precipitator (ESP), Diamond Power IK Sootblowers, High Capacity Bridge Crane, Hy-Vac Vacuum System, Spare Parts, Rolling Stock and More – Available Immediately for Purchase in Place or Bulk Plant Purchase for Relocation (Individual Subsystems Also Available in Bulk).


Contact Information

Mike Weiler

mikew@newmillcapital.com


Equipment Summary

  • Siemens Steam Turbine Generator (STG)
  • Circulating Fluidized Bed Boiler (CFB) – 330,000 #/hr Steam Generation
  • Holtec Steam Surface Condenser
  • Extraction Steam
  • Selective Catalytic Reduction (SCR) System
  • Trona Dry Injection System
  • Howden Buffalo ID Fans
  • KSB Boiler Feed Pumps
  • (2) Cell Mechanical Draft Cooling Tower
  • Biofuel Silo
  • Electrostatic Precipitator (ESP)
  • Diamond Power IK Sootblowers
  • High Capacity Bridge Crane
  • Hy-Vac Vacuum System
  • Spare Parts
  • Rolling Stock
  • and More

Share