2008 Biomass Co-Gen – 34MW
Reading, PA
Property Description
Reading, PA – Complete Biomass Cogeneration Facility
2008 Construction – Rated at 34 MW, Siemens Steam Turbine Generator (STG), Holtec Steam Surface Condenser, CFB Boiler – 330,000 lbs/hr Steam Generation, Extraction Steam, Selective Catalytic Reduction (SCR) System, Trona Injection System, Howden Buffalo ID Fans, KSB Boiler Feed Pumps, (2) Cell Mechanical Draft Cooling Tower, Biofuel Silo, Electrostatic Precipitator (ESP), Diamond Power IK Sootblowers, High Capacity Bridge Crane, Hy-Vac Vacuum System, Spare Parts, Rolling Stock and More – Available Immediately for Purchase in Place or Bulk Plant Purchase for Relocation (Individual Subsystems Also Available in Bulk).
Equipment Summary
- Siemens Steam Turbine Generator (STG)
- Circulating Fluidized Bed Boiler (CFB) – 330,000 #/hr Steam Generation
- Holtec Steam Surface Condenser
- Extraction Steam
- Selective Catalytic Reduction (SCR) System
- Trona Dry Injection System
- Howden Buffalo ID Fans
- KSB Boiler Feed Pumps
- (2) Cell Mechanical Draft Cooling Tower
- Biofuel Silo
- Electrostatic Precipitator (ESP)
- Diamond Power IK Sootblowers
- High Capacity Bridge Crane
- Hy-Vac Vacuum System
- Spare Parts
- Rolling Stock
- and More